JVACEE is a joint venture company of Arab contractor and El-sewedy
Electric, dealing with the scope of Engineering, Procurement and
Construction of Julius Nyerere Hydropower
Project in Stigler’s Gorge in Tanzania. It is expected to produce 2,115
MW of installed Capacity. On the waters of the Rufiji river, in joint
venture with The Arab Contractors of Egypt (Osman A. Osman & Co.),
ELSEWEDY ELECTRIC is entrusted by the people and government of Tanzania
to execute, The Julius Nyerere Hydropower Project.
This national mega
project that would secure clean power supply to more than 60 million
Tanzanians. Julius Nyerere Hydropower Station (JNHS; RHHP; Rufiji
Hydroelectric Power Project; Stiegler’s Gorge Dam) is a hydroelectric
dam under construction across the
Rufiji River in eastern Tanzania. Although controversial, the
government approved the plans in 2018. The power station is expected to
have an installed capacity of 2,115 megawatts (2,836,000 hp) and to
produce 5,920GWh of power annually. The project, power station and dam
are owned by and will be managed by the government owned Tanzania
Electric Supply Company (TANESCO).
J–V–A–C–E–E, Julius Nyerere Hydro Power Project (JNHPP) is Urgently Looking for the Following Candidates to fill the available below Positions :–
1) Motor Grader Operator —- 10 positions
2) Excavator Operator ——– 20 Positions
3) Bull Dozer Operator ——– 03 Positions
4) Pipe Fitter ——————- 04 Positions
5) Supervisor Piping ———– 01 Positions
6) Supervisor HVAC ———— 01 Positions
7) Wheel Loader ————— 04 Positions
Read Also:
Qualifications:
The Ideal candidate should posses a working experience of not less than 3 Years.
MODE OF APPLICATION
Interested candidates should send their up to date CV’s and ID (National, Voter’s
ID or Driving License) to jobs@jvacee.com
Visit our nearest representative offices of Kisaki Morogoro, or Mloka Rufiji, Pwani.
Deadline is 10th July 2022. Interviews and work station will be at Julius Nyerere Hydropower Project (JNHPP) This position is open for Tanzanian Local